The log book
It is fundamental to keep records on site for inspection. The log book devised from the risk assessment must allow management or maintenance to record and log information required plus monitor any trends in the system. (e.g. temperature recording). Overall the log book will demonstrate control measure tasks, therefore prove that risks are being correctly managed and controlled by providing water treatment schedules.
The Clean and Chlorination
We adopt the cleaning method in accordance with BS 6700 in order to clean both pipe work and storage tanks. This is usually carried out annually but may vary depending on the outcome of the assessment. |